Certified Ship Repair Professional™ Certification Exam
Exam Summary
0 of 60 Questions completed
Questions:
Information
You have already completed the exam before. Hence you can not start it again.
Exam is loading…
You must sign in or sign up to start the exam.
You must first complete the following:
Results
Results
0 of 60 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Ship Repair 0%
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 60
1. Question
Ship Yard refers to:
CorrectIncorrect -
Question 2 of 60
2. Question
Ship Owner refers to:
CorrectIncorrect -
Question 3 of 60
3. Question
Ship Repair Yard Customer refers to:
CorrectIncorrect -
Question 4 of 60
4. Question
Owner Representative refers to:
CorrectIncorrect -
Question 5 of 60
5. Question
Tender refers to:
CorrectIncorrect -
Question 6 of 60
6. Question
Ship Repair Manager refers to:
CorrectIncorrect -
Question 7 of 60
7. Question
Work Specification refers to:
CorrectIncorrect -
Question 8 of 60
8. Question
Change Orders refers to:
CorrectIncorrect -
Question 9 of 60
9. Question
Vessel refers to:
CorrectIncorrect -
Question 10 of 60
10. Question
Shipyard HR Department is responsible for:
CorrectIncorrect -
Question 11 of 60
11. Question
Shipyard GA Department is responsible for:
CorrectIncorrect -
Question 12 of 60
12. Question
Shipyard Internal Audit Department is responsible for:
CorrectIncorrect -
Question 13 of 60
13. Question
Shipyard HSSE Department is responsible for:
CorrectIncorrect -
Question 14 of 60
14. Question
Shipyard QA/QC Department is responsible for:
CorrectIncorrect -
Question 15 of 60
15. Question
Shipyard C&P Department is responsible for:
CorrectIncorrect -
Question 16 of 60
16. Question
Shipyard Marketing Department is responsible for:
CorrectIncorrect -
Question 17 of 60
17. Question
Shipyard Steel Department is responsible for:
CorrectIncorrect -
Question 18 of 60
18. Question
Shipyard Blasting & Painting Department is responsible for:
CorrectIncorrect -
Question 19 of 60
19. Question
Shipyard Production Control Department is responsible for:
CorrectIncorrect -
Question 20 of 60
20. Question
Ship Repair Management Department is responsible for:
CorrectIncorrect -
Question 21 of 60
21. Question
The charges for fire and safety watchman should be given in price per:
CorrectIncorrect -
Question 22 of 60
22. Question
The charges for water ballast supply should be given in price per:
CorrectIncorrect -
Question 23 of 60
23. Question
The charges for electrical shore connection supply should be given in price per:
CorrectIncorrect -
Question 24 of 60
24. Question
The charges for hull preparation works should be given in price per:
CorrectIncorrect -
Question 25 of 60
25. Question
The charges for steel renewal should be given in price per:
CorrectIncorrect -
Question 26 of 60
26. Question
Rudder plug to be opened for:
CorrectIncorrect -
Question 27 of 60
27. Question
Rudder air test is carried out for:
CorrectIncorrect -
Question 28 of 60
28. Question
Propeller rope guard to be removed for:
CorrectIncorrect -
Question 29 of 60
29. Question
Tail Shaft Withdrawal for:
CorrectIncorrect -
Question 30 of 60
30. Question
Main engine crankshaft deflection took:
CorrectIncorrect -
Question 31 of 60
31. Question
Existing bottom plug to be closed and tested by:
CorrectIncorrect -
Question 32 of 60
32. Question
Ship Repair Managers are often authorized to manage the projects on behalf of the shipowners.
CorrectIncorrect -
Question 33 of 60
33. Question
Most Ship Repair Managers act as shipyard representative.
CorrectIncorrect -
Question 34 of 60
34. Question
The shipowners are empowered to overrule the decisions related to ship safety taken by the shipyard HSSE department.
CorrectIncorrect -
Question 35 of 60
35. Question
All the shipowners are obliged to accept the shipyard terms and conditions.
CorrectIncorrect -
Question 36 of 60
36. Question
The ship repair managers are not responsible for the ship safety inside the shipyard.
CorrectIncorrect -
Question 37 of 60
37. Question
The shipowners are not responsible for the ship safety inside the shipyard.
CorrectIncorrect -
Question 38 of 60
38. Question
The tender is a normal practice that agreements between the shipyard and the shipowners.
CorrectIncorrect -
Question 39 of 60
39. Question
A ship repair manager needs to the nomination letter by the department head to manage the project.
CorrectIncorrect -
Question 40 of 60
40. Question
Hot work can be the commencement on-board the ship without a hot work permit.
CorrectIncorrect -
Question 41 of 60
41. Question
Tank gas free is not required.
CorrectIncorrect -
Question 42 of 60
42. Question
A ship repair manager is responsible for issuing the change orders.
CorrectIncorrect -
Question 43 of 60
43. Question
A ship repair manager is responsible for managing the repair activities in accordance with the HSSE rules, QA/QC standard requirements and shipowner specifications.
CorrectIncorrect -
Question 44 of 60
44. Question
A ship repair manager is not responsible for spare parts delivery delay from shipowners side.
CorrectIncorrect -
Question 45 of 60
45. Question
A ship repair manager is responsible for follow up with shipowner the spare parts delivery and advice to him the side effect of the spare parts delay.
CorrectIncorrect -
Question 46 of 60
46. Question
The shipowners are responsible for the technical repair specification include the ship drawings, technical data, and the class requirements.
CorrectIncorrect -
Question 47 of 60
47. Question
The repair specifications are not required for the quotation process.
CorrectIncorrect -
Question 48 of 60
48. Question
The shipowners are authorized to bypass the ship repair manager and give direct orders to the shipyard team.
CorrectIncorrect -
Question 49 of 60
49. Question
The shipyard team can commence the additional works or the work variations without any change orders from the ship repair manager.
CorrectIncorrect -
Question 50 of 60
50. Question
The ship ballast condition is not required for keel block arrangement and the ship can enter to the dry dock with any ballast condition.
CorrectIncorrect -
Question 51 of 60
51. Question
Area agreement is required to be agreed with shipowner before commencing the blasting and painting of the hull.
CorrectIncorrect -
Question 52 of 60
52. Question
Most critical items in the ship repair which effect on the project delivery are the steel renewal, tank cleaning, hull treatment, tanks treatment, pipes renewal and spares supply.
CorrectIncorrect -
Question 53 of 60
53. Question
The sea trial is carried out for checking the main engine conditions after the drydocking.
CorrectIncorrect -
Question 54 of 60
54. Question
The shipyard dock master is responsible for docking the ship in a safe condition with the cooperation of the ship crew.
CorrectIncorrect -
Question 55 of 60
55. Question
A ship repair manager is not responsible for Identification on site of specified works with the concerned department and agreement on technical aspects according to the yards practice and capabilities.
CorrectIncorrect -
Question 56 of 60
56. Question
The ship repair manager will coordinate between yard production departments, to get feedback on the work completion report, and the invoicers/estimators for the final invoicing process before ship departure.
CorrectIncorrect -
Question 57 of 60
57. Question
All maintenance work carried out by shipyard or sub-contractors to be recorded in the project file system.
CorrectIncorrect -
Question 58 of 60
58. Question
During repair periods no space is to be considered gas free unless a gas free certificate has been obtained and maintained.
CorrectIncorrect -
Question 59 of 60
59. Question
Prior to flooding the dock, the ship repair manager and shipowner will satisfy themselves that all drain plugs are properly fitted and that all sea valves are shut.
CorrectIncorrect -
Question 60 of 60
60. Question
The dock master can start the dock flooding without the permission from the ship repair manager and without checking the ship mooring equipment with the shipmaster.
CorrectIncorrect